Chapters
- Cover and Table of Contents
- Introduction Letter from HRA
- Executive_Summary
- Section 1 – Characteristics
- Section 2 – Area Eligibility
- Section 3 – Project Objectives
- Section 4 – Cost Estimates and Financing Plan
- Section 5 – Local Approvals
- Section 6 – Site Preparation
- Section 7 – Public Improvements
- Section 8 – Relocation
- Section 9 – Redevelopers Obligation
- Section 10 – Property Disposition
- Section 11 – Citizen Participation
- Section 12 – Implementation
Attachments
Acquisition Property Descriptions by Area
- Area 1 – Dwight Street Gateway
- Area 2 – Veteran’s Park Area
- Area 3 – Cabot and Chestnut Area
- Area 4 – High Street Area
- Area 5 – Passenger Rail/Transit Oriented Development Area (TOD)
- Area_6 – High Performance Computer Center
- Area 7 – Parsons Paper Redevelopment
- Area 8 – South Holyoke
- Area 9 – Cabot Street Gateway
- Area 10 – Riverfront Area along Second and Third Canal
Additional Documents
Maps
- A-1 Urban Renewal Plan Area Location
- A-2 Urban Renewal Plan Area Context
- A-3 Project Boundary and Topography
- A-4 FEMA Floodplan Delineation Map
- B-1 Boundary of Proposed Clearance and Rehabilitation Areas
- C-1 Existing Property Lines, Building Footprints and Parking Areas
- C-2 Proposed Property Lines, Building Footprints and Parking Area
- D-1 Existing Land Use As Per City of Holyoke Land Use Codes
- D-2 Existing Zoning
- D-3 Existing Special Overlay Districts
- E-1 Proposed Land Use
- F-1 Existing Thoroughfares, Public Right-of-Ways and Easements
- G-1 Parcels to be Acquired
- H-1 Lots to be Created for Disposition
- I-1 Buildings to be Demolished
- J-1 Buildings to be Rehabilitated
- K-1 Lots for Buildings to be Constructed
- L-2 Holyoke Center City Vision Plan Map